AI Data Center Power Calculator
IT kW = racks × kW/rack, then facility kW = IT kW × PUE. Example: 100 × 100 kW × 1.25 = 10 MW IT and 12.5 MW facility. Planning estimate, not a stamped design.
Calculator
Enter an average IT kilowatt figure per rack. You do not need a GPU model. The result updates as you type.
About this calculator
This planning estimate rolls rack IT power up to facility power. It does not size UPS, generators, cooling, or breakers. Continue on the power calculator hub, or read GPU rack power and PUE planning for the assumptions behind the inputs.
Calculation Results
Estimated IT load
10.00 MW
10,000 kW IT load
Estimated facility power
12.50 MW
12,500 kW facility power
Facility overhead
2.50 MW
2,500 kW overhead
Your AI data center is estimated to require 10.00 MW of IT power and 12.50 MW of total facility power. The difference is power used by cooling, power distribution, lighting, and other facility infrastructure represented by the PUE.
This is an estimate for planning purposes, not a detailed electrical design.
Continue Your Calculation
Facility kilowatts are real power. Convert them to kVA before UPS or transformer screening.
Planning examples
Same formulas as the calculator. Click a rack count to load that row. These are screening cases, not industry-standard racks. A small air-cooled row, the 100-rack default, and a documented rack-scale product example answer different questions.
| Racks | kW/rack | PUE | IT | Facility | Overhead |
|---|---|---|---|---|---|
| 10 | 1.00 | 10 kW | 10 kW | 0 | |
| 40 | 1.40 | 320 kW | 448 kW | 128 kW | |
| 142.5 | 1.18 | 1,425 kW | 1,681.5 kW | 256.5 kW | |
| 100 | 1.25 | 10.00 MW | 12.50 MW | 2.50 MW | |
| 200 | 1.20 | 200 MW | 240 MW | 40 MW |
The 8-rack row is an air-cooled screening case: 8 × 40 kW = 320 kW IT, × 1.40 = 448 kW facility. The 10-rack row uses 142.5 kW only as a product-documentation figure, the same order of magnitude as NVIDIA’s GB300 NVL72 “up to 142 kW” note. It is not a rating for every AI rack. Read GPU rack power before you reuse 142.5.
IT load and facility power formula
IT load (kW) = number of racks × kW per rack
Facility power (kW) = IT load × PUE
Facility overhead (kW) = facility power − IT load
1 MW = 1,000 kW. PUE is total facility power divided by IT equipment power. This page multiplies. It does not measure PUE. For what the ratio includes, use PUE planning. For why one rack can be 7 kW or about 120 kW, use GPU rack power and the rack density ranges.
Example 1: 100-rack default
100 racks × 100 kW/rack = 10,000 kW (10.00 MW) IT load. × 1.25 PUE = 12,500 kW (12.50 MW) facility power. Overhead = 12,500 − 10,000 = 2,500 kW (2.50 MW). Next step: take 12,500 kW to kW to kVA. At a power factor you choose, such as 0.95, that screen is about 13,158 kVA. This calculator does not apply power factor.
Example 2: Eight air-cooled racks
8 × 40 kW = 320 kW IT. × 1.40 PUE = 448 kW facility. Overhead = 448 − 320 = 128 kW. Use this shape when the hall is still in the air-cooled high-density band, not when you are copying a liquid-cooled rack-scale nameplate.
Example 3: Ten documented high-power racks
10 × 142.5 kW = 1,425 kW (1.43 MW) IT. × 1.18 PUE = 1,681.5 kW (1.68 MW) facility. Overhead = 256.5 kW. NVIDIA’s DGX GB200 user guide states about 120 kW for an NVL72 rack, and the GB300 NVL72 reference architecture lists a full rack up to 142 kW. Those documents describe specific products. Enter the average for the racks you are actually planning.
Racks that do not share one kilowatt rating
Add IT kilowatts, then multiply once by PUE. Twenty racks at 40 kW are 800 kW. Four racks at 120 kW are 480 kW. Combined IT load = 1,280 kW across 24 racks, so the average is 1,280 ÷ 24 ≈ 53.3 kW/rack. Enter 24 and 53.3. At PUE 1.25, facility power ≈ 1,280 × 1.25 = 1,600 kW. Do not type 120 kW into a hall where most racks are 40 kW.
What this estimate leaves out
The result is real power for the average you typed. It does not add N+1 or 2N redundancy, diversity, nameplate-versus-metered gap, transformer loss beyond the PUE ratio, utility capacity, or a growth margin. Facility overhead is not an order for chillers, pumps, or UPS modules. After facility kW, the engineering chain on this site is kW to kVA, then 3-phase power when you have a line voltage.
What to calculate next
Use this page when you already have a rack count and an average IT kilowatt figure and you need facility megawatts, or when you want to compare two PUE assumptions on the same IT load. Use rack density when you still need a kW-per-rack band, PUE planning when you need the ratio explained, and GPU rack power when the question is one server versus a rack-scale product. This page does not size cooling, breakers, or backup plant.
| You already have | Next tool |
|---|---|
| Facility kW from this page | kW to kVA |
| kVA and line voltage | 3-Phase Power |
| Device list inside one rack | UPS Load Calculator |
| UPS kVA screening | UPS Capacity Calculator |
Frequently Asked Questions
How do I estimate AI data center power?
IT kW = racks × kW per rack. Facility kW = IT kW × PUE. Overhead = facility kW − IT kW. Example: 8 racks × 40 kW × 1.40 = 320 kW IT and 448 kW facility. That is a planning estimate, not a detailed electrical design.
What is the difference between IT load and facility power?
IT load is computing power in the racks. Facility power is IT load multiplied by PUE, so it also covers cooling, electrical distribution, lighting, and other house loads. Overhead is only that difference. It is not a chiller or UPS shopping list.
What PUE should I use for a planning estimate?
Use a measured PUE when you have one. Early screening often tries about 1.15–1.25 for liquid-assisted halls and about 1.3–1.5 for air-cooled halls. See PUE planning. PUE does not size the cooling plant.
Is 100 kW per rack a standard AI rack?
No. One multi-GPU server is often under 15 kW. A documented rack-scale system can be near 120 kW or higher. 100 kW is only this calculator’s default. See GPU rack power before you lock a density.
Why doesn't this calculator ask for power factor?
The results are real power in kW and MW. Power factor converts kW to kVA, which this page does not do. After facility kW, open kW to kVA and enter your own power factor. Example: 12,500 kW at a power factor of 0.95 is about 13,158 kVA on that next calculator. 0.95 is an assumption you supply there.
What if every rack uses a different number of kilowatts?
Add the IT kilowatts first, then apply one PUE. Example: 20 racks at 40 kW is 800 kW, and 4 racks at 120 kW is 480 kW, so IT load is 1,280 kW. Average kW per rack is 1,280 ÷ 24 ≈ 53.3 kW. Enter 24 and 53.3. Do not enter 120 as if every rack were a rack-scale system.
Does facility overhead mean I should buy that much cooling?
No. Overhead is facility power minus IT load. It mixes cooling, distribution losses, lighting, and other loads into one remainder. It does not select chillers, coolant distribution units, or redundancy.
Is this the same as AI data center power requirements in the news?
No. News and policy pages talk about campus or regional demand, often in gigawatts. This page only estimates the halls whose rack count, kW per rack, and PUE you enter. It does not forecast grid demand, water use, or a utility interconnection.
Related Tools
- kW to kVA Calculator (Instant, Free, with Formula & Examples)
- 3 Phase Power Calculator (Instant, Free) — Electrical Formulas
- UPS Load Calculator
- UPS Capacity Calculator
- Factory Load Calculator
- Electricity Load Factor Calculator
- kVA to Amps Calculator (Instant, Free, with Formula & Charts)
- Amps to kVA Calculator (Instant, Free, with Formula & Examples)