Browse the full library of updated guides. Use tags to narrow down, or navigate pages.
Browse by Tag
All Updated Guides
3-Phase Unbalanced Load Formula (% + Causes & Fixes)
Unbalanced load in 3-phase systems: % formula, causes, and correction steps. Free worked example—verify currents with the 3-phase power calculator.
Read Full ArticleCapacitor Bank Sizing (kVAR Formula & PF Correction)
Size capacitor banks for power factor correction: kVAR = kW × (tan θ1 − tan θ2). Free formula, penalty payback table, and examples—verify with the kW to kVAR calculator.
Read Full ArticlePFC Harmonics & Detuned Capacitors (THD Thresholds & Formula)
Avoid capacitor resonance in power factor correction: THD limits, detuned vs standard banks, selection examples. Free formula for engineers planning PFC.
Read Full ArticleTransformer Sizing for Data Centers (UPS, Redundancy and Harmonics)
Transformer sizing for data centers for electrical engineers and designers: UPS transformer sizing, N+1 redundancy, harmonics and derating, with kVA examples.
Read Full ArticlePF Penalty in Electricity Bill (Avoid LPF + Formula)
How to avoid PF penalty in electricity bills: LPF formula, ~0.90 threshold & TNEB/EB examples. Free—size kVAR to cut the surcharge.
Read Full Article3-Phase PF: Clamp Meter Measurement Steps (True vs Displacement)
How to measure 3-phase power factor with a clamp meter or analyzer—true vs displacement PF, field steps & examples. Free guide; verify with kW→kVA tool.
Read Full ArticleFactory Load Mistakes (Not the Formula Guide)
Factory load calculation mistakes that cost capital: connected vs demand, wrong PF, and diversity errors. Free audit examples—formula steps live on the how-to guide.
Read Full ArticleFactory Load vs Transformer Size (e.g. 500 kW → kVA)
Factory load vs transformer size: convert demand kW to kVA with PF (e.g. 500 kW @ 0.85 → ~588 kVA). Free relation guide + calculator links.
Read Full ArticleFactory Load vs Energy Cost: Demand, PF & $ Impact Table
See how connected vs demand load drives kW charges and PF penalties—worked $/month examples. Primer before the energy audit playbook.
Read Full ArticleFactory Load Expansion Planning: Spare kVA & MCC Headroom
Plan electrical expansion with spare kVA bands, 1.25× headroom, and MCC slot map—numeric retrofit vs greenfield example. Free planning formula.
Read Full Article